On May 21, 2011, the large scale assembly workshop and production preparation workshop took the lead in the relocation and started the company's overall relocation. Dazhe Company earnestly implemented the second entrepreneurial spirit of China National Heavy Duty Truck Group and started the overall relocation of the company. According to the overall plan, in 2011, Big Tooth will implement the overall relocation upgrade. Coinciding with the proposed second startup of China National Heavy Duty Truck Group Corporation, the company has accelerated the implementation of the relocation plan.
At 5 o'clock in the morning, along with the festive sound of firecrackers, a press installed on the HW line of the assembly shop, a flat-bed measuring machine for spindle measuring machines and related tools, tooling, and accessories were loaded on the equipment manufacturing industry park in Datong City. As early as 6 o'clock in the morning, the car-type normal furnace and a pit-type tempering furnace in the heat treatment group of the production preparation workshop and the auxiliary equipment such as steel plates, rubber sheets, foot pedals, anchor bolts, gaskets, and small carts are all safely loaded. The new factory of Big Tooth Company. About an hour later, the vehicles carrying the relocation equipment arrived safely at the Da Tou new plant area and completed the relocation tour, which marked the official start of the relocation of the Grand Tooth Company.
The relocation work as a major event for the 2011 Big Tooth Company was highly valued by the company’s leaders. The company’s staff actively participated in the event and held several special meetings to formulate a detailed relocation plan. Dazuo Company has been rigorous, safe, and smooth in its first relocation work, which has given a good start to the next move.
Triangle Tripods,Aluminium Tripods,Ellipse Tripods
Jiangsu Laiao Material Technology Co., Ltd. , https://www.jiangsulaiao.com