List of main equipment selection for 100 tons/day full mud cyanidation gold selection

100T/d full mud cyanidation gold selection equipment list 1

Serial number Device name Technical performance and specifications unit Quantity Weight (T) Electric motor Manufacturer or drawing number Equipment prices Remarks
Single Total weight (T) model Quantity Single capacity (KW) Total bulk density (KW)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
one Grinding and grading equipment
1 1# tape conveyor B=500 station 1 ,
2 Pendulum feeder 400×400 station 1 0.505
3 2# tape conveyor B=500 station 1 1
4 Lattice ball mill Φ1500×3000 station 1 17.534 JR1215-8 95.0
5 Sorghum single spiral classifier FG-12 station 1 8.798
Drive motor station 1 Y132M2-6 5.5
Lift motor station 1 Y1004-4 2.2
6 Overflow ball mill Φ1200×2400 station 1 13.434 J315S-8 55
7 Hydrocyclone F×150 station 4 0.128 0.512
8 Chip removal screen 28 mesh station 3 0.04 0.122
9 Two-phase flow mud pump station 2 0.35 0.7 Y132M-4 7.5 15.0
10 Center drive concentrator NZS-12 station 1 29.902
Drive motor station 1 Y32S-6 3.0
Lift motor station 1 Y900<-6 1.1
11 Stirring tank JBCΦ1000×1000 station 3 1.1 3.3
12 Two-phase flow mud pump station 2 0.15 0.30 Y132M-4 7.5 15.0
13 Leaching agitation tank JJCAΦ3500×4000 station 2 5.35 10.66 Y112M—4 4 8.0
14 Leaching adsorption tank XFCAΦ3500×4000 station 4 5.35 21.34 Y112M—4 4 16.0
15 Linear vibrating screen ZS—0.4×1.5 28 mesh station 1 0.94 ZDS21-6 0.4 0.4
16 Linear vibrating screen ZS—0.4×1.5 40 mesh station 2 0.94 1.88 ZDS21-6 0.4 0.8