Runner: Cold Runner
Design Software: UG
Installation: Fixed
Standard: HASCO
Customized: Customized
Name: Thin Wall Container Bottom Mould
Cavity&Core Material: H13 / 2738 / P20
Mould Base Material: SAE1045 Steel
Mould Life: 1,000,000 Shots
Cooling System: Water Cooling
Sample Time: 45-60 Days
Sprue Gate: Side Gate
3D Format: X_T / Igs / STP / Sldprt/ Step / Stl / Dwg / etc.
Service: Logistic
Courier Service: Sample Via TNT /. DHL
Trademark: REMO
Specification: International Standard
Origin: Taizhou China
HS Code: 8480719090
Thin wall container bottom mould
As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.
Following information is essential for your better understanding on our moulds
Name Description
Products' infomation we need to make quotation Clear Pics/material/size/weight/wall thickness/targetting quantity and etc.
Mould Material 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKD61 etc
Mould Base LKM, HASCO ect.
Cavity Single/multi
Runner Hot/cold
Mould Design 3D/2D Drawing
Design Days 3 days
Design Software UG, PROE, CAD, CAE, CAM, CAXA ect
Plastic Material PP, PC, PS, PE, PU, PVC, ABS, PMMA ect
Mould Life 300, 000-3, 000, 000 shots
Injection System Pin-point-gate
Polish System Mirror Polish
Payment 40% of Deposit by T/T, 60% of Balance by T/T
Delivery Time 15-60days
Specification Depends on customers requirements
Business Step | |||||||
1. R& D | We support customer R& D. Make the files or improve the design if you needed | ||||||
↓ ↓ ↓ | |||||||
2. Quotation Making | Mould Quotation will be finished in 1 day according to information we get | ||||||
↓ ↓ ↓ | |||||||
3. Negotiation | The quality, price, material, delivery time. payment item. ect | ||||||
↓ ↓ ↓ | |||||||
4. Mould Design | 3-5 days for mould and product 3D/2D drawing design | ||||||
↓ ↓ ↓ | |||||||
5. Mould | According to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days | ||||||
↓ ↓ ↓ | |||||||
6. Mould Testing | When moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference. | ||||||
↓ ↓ ↓ | |||||||
7. Sample shoot | If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory | ||||||
 ↓ ↓ ↓  | |||||||
8. Delivery | Delivery goods by sea or by air, according customers requirement |
We have various types of deep groove ball bearings.
1.1 Deep Groove Ball Bearing 6000 Series
1.2 Deep Groove Ball Bearing 6200 Series
1.3 Deep Groove Ball Bearing 6300 Series
1.4 Deep Groove Ball Bearing 6700 Series
1.5 Deep Groove Ball Bearing 6800 Series
1.6 Deep Groove Ball Bearing 6900 Series
1.7 Deep Groove Ball Bearing Inch 1600 Series
1.8 Deep Groove Ball Bearing 16000 Series
1.9 Deep Groove Ball Bearing Widen Series
1.10 Deep Groove Ball Bearing Non Standard Series
1.11 Deep Groove Ball Bearing MR Series
1.12 Deep Groove Ball Bearing Inch R Series
1.13 Deep Groove Ball Bearing Inch R LS & RMS Series
1.14 Deep Groove Ball Bearing Inch EE Series
1.15 Deep Groove Ball Bearing WC87000 & WC88000 Series
Deep Groove Ball Bearing
Double Row Deep Groove Ball Bearing,Deep Groove Ball Bearing Puller,Deep Groove Ball Bearing Arrangement,Application Of Deep Groove Ball Bearing
NINGBO FANGXING IMPORT& EXPORT CO.,LTD. , https://www.fxbearings.com