Model NO.: HRD-0071
Runner: Hot Runner
Design Software: UG
Installation: Fixed
Certification: ISO
Standard: HASCO
Customized: Customized
Mould Steel: 2738hh,Nak80,738,2344,S136,Sdk61,P20,Px5
Mould Life: 50~100 Shots
Material: PP
Cavity: 1*1
Applicable Range: Appliance Mould
Trademark: Higrade/injection mould
Transport Package: Wood Case
Specification: ISO9001: 2008
Origin: Qingdao China
HS Code: 8480710090


Mould Steel:2738HH,NAK80,738,2344,S136,SDK61,P20,PX5 etc.
Mould Life:50~100 shots
INJECTION MOULD:
 Material: PP
Cavity: 1*1
Applicable range: Appliance mouldÂ
Lead Time: 35-45 days
PLASTIC PARTS:
Hot runner:Yes (according to the customer's request and product style)
Standard part: PUNCH, MISUMI
First trial equipment: 380T Injection Machine( moreover we also have 90-700T,750-1300T Injection Machine. There are robots for each 90-380T Injection Machine to meet the customer's bulk production requirement.
Process step: product design-CAE-3D mold design-2D drawing-CAM-milling machine-grinder-drill-CNC-wire cutting-EDM-polishing-trial assembly-grind-assemble-first trial
Our service: product and mould design, Injection mould and parts machining.
Our main customer: Haier, Hisense, Midea, Siemens, SANYO, ELX, Toyota, Kia, Foton, GM Wuling, Great wall, Hyundai, Skyworth.
 Overseas market: Japan, Korea, Thailand, Russia, Germany, England, Norway, Italy, USA, Spain, Turkey, Denmark, Brazil, Argentina, Egypt, South Africa, Iran,Pakistan,India.
Mould painting: according to Customer's request
Packing: Wooden Case
Â
Step | Item | Description |
1 | Quotation | We offer you the mould and part quotation according to your details(drawing or sample,material,quantity,weight). |
2 | Order | If our quotation is competitive,you will place the order. |
3 | Drawing design | We design the mould structure drawing according to your product drawing or sample,then send to you for confirmation. |
4 | Mould making | After your confirmation of our drawing,we begin to make the moulds,during manufacturing program,we send you mould building progress with pictures every week,for you to know our process. |
5 | First trial | We will make the mould first trial on time, then send you video, picture and samples for you to confirm. |
6 | Quality confirm | You will confirm our mould quality according to sample. If you need to adjust the product structure,we can help you change the mould further. |
7 | Delivery | Ship the mould after it is completely OK,packed by wooden case. |
Oem Motorcycle Parts,Motorcycle Parts Online,Motorcycle Electrical Parts,Motorcycle Electrical Accessories
Zhejiang Zhengdong Motorcycle Parts Co., Ltd. , https://www.zhengdonglock.com